We just released new images of the Lassonde Studios construction site. We’ve started installing cabinets and painting walls on the inside. On the outside, we are still installing windows and attaching the copper siding. Learn more about the building here: lassonde.utah.edu/studios. Students move in on Aug. 18, 2016. See you there!
